电动汽车充电桩应该如何安装
添加时间:2017/5/3 14:30:15     浏览次数:

电动汽车充电桩安装第一步:充电条件确认

The first step in charge of electric car charging pile: charging condition confirm

 

  电动汽车充电桩安装过程中最为关键的一步是充电条件的确认,关键点在于是否有固定停车位和物业同意安装充电桩的申请,搞定这两点你几乎就可以高枕无忧了。那么充电条件的确认具体步骤都有哪些呢?

Electric vehicle charging pile installation process charging conditions, is the most crucial step in the confirmation, the key point is whether fixed parking space and property agreed to install charging pile, fix these two points you almost can rest easy. So what are the specific steps for identifying the charging criteria?

 

  1、用户与汽车厂商或4S店签订购车意向协议后,办理购车充电条件确认手续,此时需要提供的材料包括:

After the user has signed an agreement with the auto manufacturer or the 4S shop to confirm the purchase of the car, the necessary materials include:

 

  1)购车意向协议;

1) purchase intention agreement;

 

  2)申请人身份证明;

The identity certificate of the applicant;

 

  3)固定车位产权或使用权证明;

Certificates of fixed property right or right to use;

 

  4)关于在停车位安装电动汽车充电设备的申请(物业盖章同意);

4) the application for electric car charging equipment in a parking space (the property seal agrees);

 

  5)停车位(库)平面图(或现场环境照片)。

5) a flat surface (or field photo) of a parking space.

  2、受理用户申请后,汽车厂商或4S店对用户资料的真实性和完整性核实无误后,会同供电公司按照约定勘查时间到现场进行用电、施工可行性勘查。

2, after handling the user's application, automobile manufacturers or 4 s shop after the successful verification for the authenticity and completeness of the user data, in conjunction with the electric power supply company, in accordance with the contract, exploration time to the scene to electricity, construction feasibility of exploration.

  3、供电公司负责对用户电源条件进行确认,完成《自用充电设施用电初步可行性方案》编制。

The power supply company shall be responsible for the confirmation of the user's power supply, and the preparation of the preliminary feasibility plan for the use of electric charging facilities shall be completed.

  4、汽车厂商或4S店负责对充电设施建设的施工可行性进行确认,会同供电公司于7个工作日内出具《新能源小客车购车充电条件确认书》。

4, car manufacturers or 4 s shop is responsible for to confirm feasibility of the construction of the charging infrastructure construction, together with the power supply company in 7 working days to issue the new energy car car charging conditions for confirmation.

 

电动汽车充电桩安装第二步:供电方案申请

The second step of the electric car charging pile installation: the application of the power supply plan

 

  用户正式签订购车合同后,可自行或委托汽车厂商或4S店向所在区域供电公司营销部(客户服务中心)提出用电报装申请。供电公司营销部(客户服务中心)在7个工作日内正式答复供电方案。用户应在有效期内到供电公司营销部(客户服务中心)办理确认手续。

User after the formal purchase contract, but on its own or entrust auto manufacturers or 4 s shops to the area power supply company Marketing Department (customer service center) apply for reporting for electricity. The power supply company Marketing Department (customer service center) officially answers the power supply plan within 7 working days. The user should go to the Marketing Department (customer service center) of the power supply company during the period of validity.

 

电动汽车充电桩安装第三步:安装施工

The third step of electric car charging pile installation: installation

 

  用户正式取得供电方案确认后,由汽车厂商或4S店组织开展充电设施工程建设,充电桩设备选型应符合国家相关要求,但不同车企所选择的充电设施建设企业会有所不同。不含土建工程的充电设施施工应在3个工作日内完成。

User power supply scheme is obtained formally confirmed by the car makers or 4 s shop organization to carry out the charging infrastructure construction, charging pile equipment selection should comply with the relevant national requirements, but different car companies chosen charging infrastructure construction enterprises will be different. The construction of rechargeable facilities without civil engineering should be completed within three working days.

 

  电动汽车充电桩安装第四步:验收申请

The fourth step for electric car charging pile: acceptance application

  充电设施建设完成后,用户需向所在区域供电公司营销部(客户服务中心)提出验收申请。工程检验合格并办结相关手续(供用电合同签署)后,供电公司于5个工作日内完成装表接电工作。在整个过程中,电力公司不收取任何费用。

After the construction of charging facilities is completed, the user shall submit the application for acceptance to the Marketing Department (customer service center) of the area where he is located. After the inspection of the project and the relevant formalities (signed by the power supply contract), the power supply company shall complete the installation of the electric power in 5 working days. Throughout the process, power companies don't charge any fees.

上一页  智能电网智能充电桩无线方案  
下一页  新能源电动汽车充电桩原理
  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3

Copyright © 技术支持:遨游网络

  • 联系我们
  • 网上订单
  • 工程案例
  • 本站导航

搜索

  • 关于我们
  • 新闻动态
  • 案例展示
  • 网上订单
  • 联系我们
  • 产品分类1
  • 产品分类2
  • 产品分类3